1 |
Block 8- 1st Phase Plaster, Floor Tiles, Toilet Walls, Kitchen Counter, Fire MS Riser Pipe, Aluminium Window |
|
2 |
Block 20-Toilet Plumbing, Plumbing Work, Electrical Work, Plaster, Garage Railing, Fire MS Riser Pipe |
|
3 |
Block 21-Toilet Plumbing, Plumbing Work, Electrical Work, Plaster, Garage Railing, Fire MS Riser Pipe |
|
4 |
|
|
5 |
|
|
6 |
|
|
7 |
Block- 1 Internal Putty , Flooring, Electric conduct Wire, Aluminium Window, Balcony Railing, Fire Door, Fire Pipe, Flush Door, Kitchen Counter, Lift Facia, Stair Railing., Block - 1 |
|
8 |
Block 2- Internal Putty , Flooring, Electric conduct Wire, Aluminium Window, Balcony Railing, Fire Door, Fire Pipe, Flush Door, Kitchen Counter, Lift Facia, Stair Railing., Block - 2 |
|
9 |
Block 3- Aluminium Window, Marble Flooring, Stair Marble And Flooring, Toilet Wall Tiles, Fire MS Riser , Ground Floor PCC |
|
10 |
Block 7- 1st Phase Plaster, Floor Tiles, Toilet Walls, Kitchen Counter, Fire MS Riser Pipe |
|
11 |
Block 22-Toilet Plumbing, Plumbing Work, Electrical Work, Plaster, Garage Railing, Fire MS Riser Pipe |
|